【例句】
Design Verification. Company shall verify each Deliverable and Final Deliverable upon receipt and shall give Jabil written notice of any rejection of a Deliverable or Final Deliverable for failure to materially conform to the SOW or the Specifications due solely to a material breach by Jabil (“Defect”) within ten (10) business days following Company’s receipt of a Deliverable; and thirty (30) days following Company’ receipt of the final Deliverable (“Acceptance Period”). Such written notice of rejection shall include a detailed and complete description of Company’s basis for asserting the alleged Defect (“Notice of Defect”). If Company fails to provide such Notice of Defect to Jabil within the Acceptance Period, such Deliverable or Final Deliverable shall be deemed accepted by Company and any corresponding Milestone completed. If Jabil determines that any such Deliverable or Final Deliverable does in fact contain a Defect; then Jabil will correct such Defect at no additional charge to Company for any additional NRE Costs that directly arise from such correction efforts and redeliver the corrected Deliverable or Final Deliverable as soon as commercially practicable. The acceptance procedures set forth in this Section 3.4 shall apply to any redelivered Deliverable or Final Deliverable.
【參考譯文】
設計審核。xx公司應在收到每件成果和最終成果後對其進行審核,凡完全由於捷普嚴重違約,使某件成果或最終成果未實質符合《工作說明書》或規格(“瑕疵”), 則xx公司應在收到該成果後十個(10)工作日內或在收到該最終成果後三十(30)天內(“驗收期”),向捷普發出拒收該成果或最終成果的通知書。拒收通知書應當詳盡說明xx公司指稱該成果或最終成果有瑕疵的依據(“瑕疵通知”)。如果xx公司未在驗收期內向捷普發出瑕疵通知,視為xx公司接受該成果或最終成果,相應的里程碑已經完成。如果捷普認定任何成果或最終成果確實含有瑕疵,則捷普將改正該瑕疵,但捷普不會向xx公司另外收取改正瑕疵直接產生的非經常性工程费用。捷普將在商業上切實可行的情况下儘快重新交付改正後的成果或最終成果。重新交付的成果或最終成果亦須遵守第3.4條規定的驗收程序。